Backup power must be installed to the same standard as any other fixed electrical work. For inverter and lithium battery systems, that means a registered electrician, the right certificate of compliance and, where needed, municipal registration.

Compliance and CoC

Why Compliance Matters Before the First Switch-Over

A backup system is not just about keeping the lights on during load-shedding. It changes how power enters the property, how circuits are protected, and how your home or business behaves when mains supply drops out and comes back on again. If the wiring, changeover arrangement or protection is wrong, the result can be nuisance tripping, damaged equipment, fire risk, or a failed inspection when you try to sell or lease the property.

For clients in Randburg, Johannesburg, Sandton, Fourways and the wider Gauteng area, compliance is especially important where older wiring, DIY alterations, or previous alterations are already in place. A proper backup installation must be treated as fixed electrical work, not as a plug in solution with a few loose connections. The system needs to be sized and installed for the actual load, the cable routes, the breaker protection and the battery location. A tidy installation is not enough if it is not legal.

Who Must Install the System

Backup installations must be done by a registered electrician who is competent to work on the relevant electrical circuits. This applies to inverter installation, battery installation, essential circuit wiring, changeover solutions and commissioning. The electrician should be able to check the existing distribution board, confirm cable sizes, identify earthing and bonding issues, and isolate the essential loads that will be supported during outages.

In practical terms, this means the person doing the work must be able to sign off what has been installed and stand behind the electrical safety of the system. A homeowner or business owner may choose the equipment, but the connection work and final compliance responsibility sit with the qualified installer. If the backup system is being added to a shop, office, workshop or medical space, the stakes are higher because the load pattern is different and the downtime cost can be immediate.

  • Confirm the installer is a registered electrician for the work being done
  • Make sure the scope covers inverter, battery, wiring and protection devices
  • Ask how the essential loads will be separated from non essential loads
  • Check that the installation method suits the site, not just the product
Book a site check

Share what must stay on during an outage and the size of the property, and a backup planner will phone or message you.

Contact form

What a Certificate of Compliance Covers

A Certificate of Compliance, or CoC, is the document that confirms the electrical installation work meets the required standard at the time it was inspected and tested. For a backup power project, the CoC should reflect the relevant changes made to the electrical installation, including the inverter connection, battery arrangement, changeover method and any essential circuit rewiring. It is not a marketing document. It is a legal safety record.

The CoC matters for insurance, property transfers and ongoing maintenance. If a problem happens later, the document helps show that the installation was tested correctly when completed. Without it, you may struggle to prove that the work was legal and safe. Keep it with your household or business electrical records, along with manuals, commissioning notes and any municipal approvals if the system is grid tied.

  • Ask for the CoC after the electrical work is completed and tested
  • Keep the certificate with your property records in a safe place
  • Make sure the scope on the certificate matches the actual work done
  • Request supporting notes for test results, changeover details and circuit allocations

Grid-Tied Systems and Municipal Registration

If the backup system connects in any way to the grid, including a grid tied inverter arrangement or a system that can export power, municipal registration may be required. Rules differ from one municipality to another, and in Gauteng the process can vary between Johannesburg, Pretoria, Centurion, Midrand and Roodepoort. Some municipalities require application forms, single line diagrams, proof of compliance, and approval before energising the system.

This is not paperwork to leave for later. If registration is needed and has not been done, the owner may face delays, connection issues or compliance problems during an inspection. The safest approach is to ask from the start whether the intended system is purely backup, or whether it will interact with the municipal supply in a way that triggers registration. A registered electrician should guide you through that process and help with the required drawings and documents.

A Practical Sizing Checklist Before Installation

Good compliance starts with good sizing. A system that is too small may overload, while one that is poorly designed can waste battery capacity or leave essential circuits unsupported. For homes, this usually means choosing the items that must stay on during load-shedding, such as lights, Wi-Fi, TV, alarm systems and a few plug points. For businesses, it may include point of sale equipment, office networking, gate motors, security systems, refrigeration or essential production equipment.

The battery and inverter should match the load profile, the duration you want to cover, and the type of usage. Lithium batteries are commonly selected for backup because they handle repeated charge and discharge cycles well, but the system still needs correct protection, ventilation and battery management. In coastal areas, humidity can affect enclosures and connections, while in many Gauteng properties older switchboards need upgrades before new equipment can be added.

  • List the circuits you want backed up, not every appliance in the building
  • Check start-up loads for fridges, pumps, printers and motors
  • Confirm battery location, ventilation and cable route
  • Allow for future battery expansion if usage may grow
  • Review whether the existing DB board needs work before installation

What to Prepare for the Site Visit

Before a site assessment, gather the basics so the electrician can give practical advice. The more accurate the information, the better the backup sizing and the cleaner the installation plan. A site visit should not be guesswork. It should confirm the real load, the available space, the condition of the switchboard and whether any municipal or building rules apply to the property.

If you manage a business property, include after-hours access details and note any critical circuits that cannot be interrupted for long. In homes, tell the team if there are pool pumps, borehole pumps, security systems or home offices that need special treatment. That makes it easier to separate essential circuits from non essential ones and avoids nasty surprises during the first outage.

  • Have a recent photo of the distribution board if possible
  • List the appliances and circuits that must stay on during outages
  • Note any previous electrical upgrades or repairs
  • Tell the team if the property has three phase supply or special loads
  • Flag any tight spaces, access issues or building rules before the visit

After Installation: Records, Maintenance and Fault Checks

Once the system is installed, the work is not finished. Commissioning should confirm that the inverter switches correctly, the batteries charge as expected and the essential circuits behave properly when mains power is cut. After that, the owner should keep the CoC, commissioning notes and any municipal registration documents together for future reference. If the backup system is expanded later, those records help the electrician see what was done previously.

Routine servicing matters too. Loose terminals, dust, heat build-up, ageing batteries and incorrect settings can all affect performance over time. If the system starts to trip, alarms sound, or the backup time changes noticeably, arrange a fault check before the next outage. It is much easier to sort out a small wiring issue or settings problem than to discover it during load-shedding at night.

If it is fixed to the board, it must be done properly and certified.

Sizing, install and battery questions

Do I need a registered electrician for an inverter and lithium battery installation?

Yes. Fixed backup power work should be done by a registered electrician who can install, test and certify the electrical changes safely.

What does a Certificate of Compliance prove?

It confirms that the electrical installation work was inspected and tested and met the required standard at the time the certificate was issued.

Do grid-tied backup systems need municipal approval?

Often yes. If the system connects to or interacts with the grid, municipal registration or approval may be required, depending on the local rules.

Tell us what has to stay on, and we will size it.